FIRE PLANNING-FIRE PLAN TARGET LIST [FP.FPT]
LINE 1 — DATE AND TIME______________________________(DTG)
LINE 2 — UNIT________________________________________(Unit Making Report)
LINE 3 — POI__________________________________________(Primary Option Indicator. Enter ADD, AMEND, or CANCEL)
LINE 4 — PLAN _______________________________________(Fire Plan Designation)
LINE 5 — TARGET NO._________________________________(Fire Support Target Number)
LINE 6 — TARGET ID___________________________________(Target Identification Number)
LINE 7 — ZONE________________________________________(UTM Grid Zone and 100-KM Square)
LINE 8 — GRID________________________________________(UTM or Six-Digit Grid Coordinate With MGRS Grid Zone Designator)
LINE 9 — TARGET ELEMENTS___________________________(Number of Target Elements)
LINE 10 — TYPE_______________________________________(Target or Friendly Unit Type and Subtype)
LINE 11 — PROTECTION________________________________(Degree of Personnel Protection)
LINE 12 — RADIUS_____________________________________(Target Radius in Meters)
LINE 13 — LENGTH ____________________________________(Target Length in Meters)
LINE 14 — WIDTH _____________________________________(Target Width in Meters)
LINE 15 — ATTITUDE __________________________________(Target Attitude in Mils)
LINE 16 — ACCURACY_________________________________(Target Report Accuracy in Meters)
LINE 17 — RELATIVE TIME______________________________(Time in Minutes Relative to H-Hour)
LINE 18 — PRIORITY___________________________________(Fire Plan Target Priority)
LINE 19 — PHASE______________________________________(Phase of Fire)
LINE 20 — PHASE______________________________________(Phase of Fire)
LINE 21 — PHASE______________________________________(Phase of Fire)
LINE 22 — PHASE______________________________________(Phase of Fire)
LINE 23 — GROUP______________________________________(Target Group Number)
LINE 24 — SERIES______________________________________(Target Series Name and Attack Sequence Number)
LINE 25 — POSITION___________________________________(Single Firing Site Designator)
LINE 26 — TARGET LIST________________________________(Target List/Last Target Indicator)
**Repeat lines 5 through 26 if necessary. Assign sequential line numbers to succeeding iterations; for example, first iteration 5 through 26; second iteration 5a through 26a; and so on.
LINE 27 — NARRATIVE_________________________________(Free Text for Additional Information Required for Clarification of Report)
LINE 28 — AUTHENTICATION___________________________(Report Authentication)