LINE 1 -- DATE AND TIME______________________________(DTG)
LINE 2 -- UNIT________________________________________(Unit Making Report)
LINE 3 -- REQUESTING AGENCY________________________(Identifier or Designator of the Requesting Agency)
LINE 4 -- LOCATION___________________________________(UTM or Six-Digit Grid Coordinate With MGRS Grid Zone Designator)
LINE 5 -- DATE________________________________________(Date Maintenance Support is Required)
LINE 6 -- NOMENCLATURE_____________________________(Category, Name, and Model of Equipment Requiring Maintenance Support)
LINE 7 -- NO. PIECES___________________________________(Number of Pieces of Equipment Requiring Maintenance Support)
LINE 8 -- TYPE ________________________________________(Type of Maintenance Support Required)
**Repeat lines 3 through 8 for each type of equipment requiring maintenance support. Assign sequential line numbers to succeeding iterations; for example, first iteration 3 through 8; second iteration 3a through 8a, and so on.
LINE 9 -- EQUIPMENT LOCATION_______________________(Location of Equipment Needing Support Using UTM or Six-Digit Grid Coordinate With Grid Zone Designator)
LINE 10 -- CONDITION_________________________________(Brief Description of Equipment Condition)
LINE 11 -- SPECIAL INSTRUCTIONS _____________________(Special Instructions Relevant to Special Tools, Components Needed to Perform Support)
LINE 12 -- COORDINATION_____________________________(Coordination Instructions Required Between Supported and Supporting Units)
LINE 13 -- NARRATIVE_________________________________(Free Text for Additional Information Required for Clarification of Report)
LINE 14 -- AUTHENTICATION___________________________(Report Authentication)