SUPPORT-DAMAGE AVOIDANCE AREA [SPRT.DAACAT]
LINE 1 — DATE AND TIME______________________________(DTG)
LINE 2 — UNIT________________________________________(Unit Making Report)
LINE 3 — POI__________________________________________(Primary Option Indicator. Enter ADD, AMEND, or CANCEL)
LINE 4 — PLAN________________________________________(Fire Plan Designation)
LINE 5 — AREA NAME__________________________________(Damage Avoidance Area Name)
LINE 6 — ZONE _______________________________________(UTM Grid Zone and 100-KM Square)
LINE 7 — ONE GRID____________________________________(UTM 1-Meter Easting, UTM 1-Meter Northing)
LINE 8 — TWO GRID ___________________________________(UTM 1-Meter Easting, UTM 1-Meter Northing)
LINE 9 — THREE GRID__________________________________(UTM 1-Meter Easting, UTM 1-Meter Northing)
LINE 10 — FOUR GRID__________________________________(UTM 1-Meter Easting, UTM 1-Meter Northing)
LINE 11 — FIVE GRID___________________________________(UTM 1-Meter Easting, UTM 1-Meter Northing)
LINE 12 — SIX GRID____________________________________(UTM 1-Meter Easting, UTM 1-Meter Northing)
LINE 13 — SEVEN GRID_________________________________(UTM 1-Meter Easting, UTM 1-Meter Northing)
LINE 14 — EIGHT GRID _________________________________(UTM 1-Meter Easting, UTM 1-Meter Northing)
LINE 15 — NINE GRID__________________________________(UTM 1-Meter Easting, UTM 1-Meter Northing)
LINE 16 — CIRCLE _____________________________________(UTM 1-Meter Easting, UTM 1-Meter Northing)
LINE 17 — RADIUS_____________________________________(Circular Area Radius in Meters)
LINE 18 — PERSONNEL_________________________________(Personnel Damage Category and Level of Assurance)
LINE 19 — FACILITY ___________________________________(Facility Damage Category and Level of Assurance)
LINE 20 — THERMAL___________________________________(Thermal Ignition Damage Category and Level of Assurance)
LINE 21 — CHEMICAL MINIMUM________________________(Minimum Desired Chemical Effects)
LINE 22 — MAXIMUM__________________________________(Maximum Desired Chemical Effects and Persistent Indicator)
LINE 23 — NARRATIVE_________________________________(Free Text for Additional Information Required for Clarification of Report)
LINE 24 — AUTHENTICATION___________________________(Report Authentication)