FIRE PLANNING-NUCLEAR SCHEDULE [FP.NUCSCD]
LINE 1 — DATE AND TIME______________________________(DTG)
LINE 2 — UNIT________________________________________(Unit Making Report)
LINE 3 — POI__________________________________________(Primary Option Indicator. Enter ADD, AMEND, or CANCEL)
LINE 4 — PLAN_______________________________________(Fire Plan Designation)
LINE 5 — TARGET NO._________________________________(Fire Support Target Number)
LINE 6 — ZONE_______________________________________(UTM Grid Zone and 100-KM Square)
LINE 7 — GRID________________________________________(UTM or Six-Digit Grid Coordinate With MGRS Grid Zone Designator)
LINE 8 — ALTITUDE____________________________________(Altitude in Meters)
LINE 9 — DGZ GZ & 100-KM SQ__________________________(Desired Ground Zero – UTM Grid Zone and 100-KM Square)
LINE 10 — DGZ 1M E & 1M N____________________________(Desired Ground Zero – UTM 1-Meter Easting and UTM 1-Meter Northing)
LINE 11 — GZ ALTITUDE________________________________(Ground Zero Altitude in Meters)
LINE 12 — TARGET ELEMENTS__________________________(Number of Target Elements)
LINE 13 — TYPE_______________________________________(Target or Friendly Unit Type and Subtype)
LINE 14 — PROTECTION________________________________(Degree of Personnel Protection)
LINE 15 — RADIUS_____________________________________(Target or Friendly Unit Radius)
LINE 16 — LENGTH_____________________________________(Target or Friendly Unit Length)
LINE 17 — WIDTH______________________________________(Target or Friendly Unit Width)
LINE 18 — ATTITUDE___________________________________(Attitude in Mils)
LINE 19 — TIME_______________________________________(Time in Minutes Relative to H-Hour)
LINE 20 — DURATION__________________________________(Duration of Fire)
LINE 21 — UNIT DESIGNATORS_________________________(Section, Platoon, Battery/
Company, Battalion/ Regiment and Regiment/ Brigade/Division Designators)
LINE 22 — POSITION___________________________________(UTM or Six-Digit Grid Coordinate With Grid Zone Single Firing Site Designator)
LINE 23 — FIRE FOR EFFECT____________________________(Fire for Effect Number of
Volleys)
LINE 24 — PROJECTILE_________________________________(Fire for Effect Projectile)
LINE 25 — FUZE_______________________________________(Fire for Effect Fuze)
LINE 26 — NARRATIVE_________________________________(Free Text for Additional Information Required for Clarification of Report)
LINE 27 — AUTHENTICATION___________________________(Report Authentication)