AMMUNITION FIRE UNIT-FIRING SITE DATA [AFU.FSD]

Use to establish and exchange dispersed firing site data for individual cannon, rocket, or missile weapons for the purpose of making tactical fire direction decisions. Reference: FM 6-20-30 and FM 6-20-40.

LINE 1 — DATE AND TIME______________________________(DTG)

LINE 2 — UNIT________________________________________(Unit Making Report)

LINE 3 — POI__________________________________________(Primary Option Indicator. Enter ADD, AMEND, or CANCEL)

LINE 4 — PLAN________________________________________(Fire Plan Designation)

LINE 5 — ZONE________________________________________(UTM Grid Zone and 100-KM Square)

LINE 6 — POSITION____________________________________(UTM or Six-Digit Grid Coordinate With MGRS Grid Zone Designator)

LINE 7 — UTM_________________________________________(UTM 1-Meter Easting, UTM 1-Meter Northing, and Altitude in Meters)

LINE 8 — RESPONSE___________________________________(Firing Site Response Time)

LINE 9 — HE __________________________________________(Number of High-Explosive Warheads)

LINE 10 — ICM________________________________________(Number of Dual Purpose ICM Warheads)

LINE 11 — MISSILE ASSEMBLIES________________________(Number of Main Missile Assemblies)

LINE 12 — POSTURE___________________________________(Firing Site Response Posture)

LINE 13 — STATUS_____________________________________(Fire Unit Status)

LINE 14 — RETURN TO OPERATION______________________(Expected Time, Return to Operation)

LINE 15 — RADIATION STATUS__________________________(Nuclear Radiation Exposure Status)

LINE 16 — NVC________________________________________(Nuclear Vulnerability Category)

LINE 17 — WARHEAD UPLOADED________________________(Warhead Type on Launcher)

LINE 18 — NARRATIVE_________________________________(Free Text for Additional Information Required for Clarification of Report)

**Repeat lines 5 through 18 up to four iterations if required. Assign sequential line numbers to succeeding iterations; for example, first iteration, 5 through 18; second iteration, 19 through 32; third iteration, 33 through 46; and so on.

LINE 19 — AUTHENTICATION___________________________(Report Authentication)


Important Information: We strive to provide information on this website that is accurate, complete and timely, but we make no guarantees about the information, the selection of schools, school accreditation status, the availability of or eligibility for financial aid, employment opportunities or education or salary outcomes. Visit here for important information on these topics.