LINE 1 -- DATE AND TIME______________________________(DTG)
LINE 2 -- UNIT________________________________________(Unit Making Report)
LINE 3 -- POI__________________________________________(Primary Option Indicator. Enter ADD, AMEND, or CANCEL)
LINE 4 -- ORDER_______________________________________(Order of Survey Accuracy)
LINE 5 -- CONTROL____________________________________POINT (Survey Control Point Name)
LINE 6 -- UTM EAST ___________________________________(UTM .01-Meter Higher Order Easting)
LINE 7 -- UTM NORTH__________________________________(UTM .01-Meter Higher Order Northing)
LINE 8 -- ALTITUDE____________________________________(SCP Altitude to 0.1-Meter)
LINE 9 -- SOURCE_____________________________________(Source of Station Data)
LINE 10 -- STATION DESCRIPTION ______________________(Description, Control Point Station)
LINE 11 -- ROUTE______________________________________(Description of Route to SCP)
LINE 12 -- ALFA_______________________________________(First Azimuth Mark Name)
LINE 13 -- MARK ALFA_________________________________(Description, Azimuth Mark)
LINE 14 -- AZIMUTH TO ALFA___________________________(Azimuth to the Nearest One Thousandth of a Mil)
LINE 15 -- BRAVO_____________________________________(Second Azimuth Mark Name)
LINE 16 -- MARK BRAVO_______________________________(Description, Azimuth Mark)
LINE 17 -- AZIMUTH TO BRAVO_________________________(Azimuth to the Nearest One Thousandth of a Mil)
LINE 18 -- NARRATIVE_________________________________(Free Text for Additional Information Required for Clarification of Report)
LINE 19 -- AUTHENTICATION___________________________(Report Authentication)