SUPPORT-AIR CORRIDOR [SPRT.AIRCOR]
LINE 1 — DATE AND TIME______________________________(DTG)
LINE 2 — UNIT________________________________________(Unit Making Report)
LINE 3 — POI__________________________________________(Primary Option Indicator. Enter ADD, AMEND, or CANCEL)
LINE 4 — PLAN________________________________________(Fire Plan Designation)
LINE 5 — NAME _______________________________________(Air Corridor Name)
LINE 6 — FROM _______________________________________(DTG Effective From)
LINE 7 — TO __________________________________________(DTG Effective To)
LINE 8 — ZONE ALFA __________________________________(UTM Grid Zone and 100-KM Square)
LINE 9 — POINT ALFA__________________________________(UTM 1-Meter Easting and UTM 1-Meter Northing)
LINE 10 — ALFA WIDTH________________________________(Width in Meters)
LINE 11 — ALFA MIN __________________________________(Minimum Altitude in Meters)
LINE 12 — ALFA MAX__________________________________(Maximum Altitude in Meters)
LINE 13 — ZONE BRAVO________________________________(UTM Grid Zone and 100-KM Square)
LINE 14 — POINT BRAVO_______________________________(UTM 1-Meter Easting and UTM 1-Meter Northing)
LINE 15 — BRAVO WIDTH_______________________________(Width in Meters)
LINE 16 — BRAVO MIN_________________________________(Minimum Altitude in Meters)
LINE 17 — BRAVO MAX ________________________________(Maximum Altitude in Meters)
LINE 18 — ZONE CHARLIE______________________________(UTM Grid Zone and 100-KM Square)
LINE 19 — POINT CHARLIE_____________________________(UTM 1-Meter Easting and UTM 1-Meter Northing)
LINE 20 — CHARLIE WIDTH_____________________________(Width in Meters)
LINE 21 — CHARLIE MIN _______________________________(Minimum Altitude in Meters)
LINE 22 — CHARLIE MAX_______________________________(Maximum Altitude in Meters)
LINE 23 — ZONE DELTA________________________________(UTM Grid Zone and 100-KM Square)
LINE 24 — POINT DELTA_______________________________(UTM 1-Meter Easting and UTM 1-Meter Northing)
LINE 25 — DELTA WIDTH_______________________________(Width in Meters)
LINE 26 — DELTA MIN_________________________________(Minimum Altitude in Meters)
LINE 27 — DELTA MAX_________________________________(Maximum Altitude in Meters)
LINE 28 — ZONE ECHO_________________________________(UTM Grid Zone and 100-KM Square)
LINE 29 — POINT ECHO________________________________(UTM 1-Meter Easting and UTM 1-Meter Northing)
LINE 30 — ECHO WIDTH________________________________(Width in Meters)
LINE 31 — ECHO MIN__________________________________(Minimum Altitude in Meters)
LINE 32 — ECHO MAX__________________________________(Maximum Altitude in Meters)
LINE 33 — ZONE FOXTROT______________________________(UTM Grid Zone and 100-KM Square)
LINE 34 — POINT FOXTROT_____________________________(UTM 1-Meter Easting and UTM 1-Meter Northing)
LINE 35 — FOXTROT WIDTH____________________________(Width in Meters)
LINE 36 — FOXTROT MIN ______________________________(Minimum Altitude in Meters)
LINE 37 — FOXTROT MAX______________________________(Maximum Altitude in Meters)
LINE 38 — ZONE GOLF_________________________________(UTM Grid Zone and 100-KMSquare)
LINE 39 — POINT GOLF________________________________(UTM 1-Meter Easting, UTM 1-Meter Northing)
LINE 40 — GOLF WIDTH________________________________(Width in Meters)
LINE 41 — GOLF MIN __________________________________(Minimum Altitude in Meters)
LINE 42 — GOLF MAX__________________________________(Maximum Altitude in Meters)
LINE 43 — ZONE HOTEL________________________________(UTM Grid Zone and 100-KM Square)
LINE 44 — POINT HOTEL_______________________________(UTM 1-Meter Easting and UTM 1-Meter Northing)
LINE 45 — NARRATIVE_________________________________(Free Text for Additional Information Required for Clarification of Report
LINE 46 — AUTHENTICATION___________________________(Report Authentication)