FIRE PLANNING-NUCLEAR SCHEDULE [FP.NUCSCD]
LINE 1 -- DATE AND TIME______________________________(DTG)
LINE 2 -- UNIT________________________________________(Unit Making Report)
LINE 3 -- POI__________________________________________(Primary Option Indicator. Enter ADD, AMEND, or CANCEL)
LINE 4 -- PLAN_______________________________________(Fire Plan Designation)
LINE 5 -- TARGET NO._________________________________(Fire Support Target Number)
LINE 6 -- ZONE_______________________________________(UTM Grid Zone and 100-KM Square)
LINE 7 -- GRID________________________________________(UTM or Six-Digit Grid Coordinate With MGRS Grid Zone Designator)
LINE 8 -- ALTITUDE____________________________________(Altitude in Meters)
LINE 9 -- DGZ GZ & 100-KM SQ__________________________(Desired Ground Zero - UTM Grid Zone and 100-KM Square)
LINE 10 -- DGZ 1M E & 1M N____________________________(Desired Ground Zero - UTM 1-Meter Easting and UTM 1-Meter Northing)
LINE 11 -- GZ ALTITUDE________________________________(Ground Zero Altitude in Meters)
LINE 12 -- TARGET ELEMENTS__________________________(Number of Target Elements)
LINE 13 -- TYPE_______________________________________(Target or Friendly Unit Type and Subtype)
LINE 14 -- PROTECTION________________________________(Degree of Personnel Protection)
LINE 15 -- RADIUS_____________________________________(Target or Friendly Unit Radius)
LINE 16 -- LENGTH_____________________________________(Target or Friendly Unit Length)
LINE 17 -- WIDTH______________________________________(Target or Friendly Unit Width)
LINE 18 -- ATTITUDE___________________________________(Attitude in Mils)
LINE 19 -- TIME_______________________________________(Time in Minutes Relative to H-Hour)
LINE 20 -- DURATION__________________________________(Duration of Fire)
LINE 21 -- UNIT DESIGNATORS_________________________(Section, Platoon, Battery/
Company, Battalion/ Regiment and Regiment/ Brigade/Division Designators)
LINE 22 -- POSITION___________________________________(UTM or Six-Digit Grid Coordinate With Grid Zone Single Firing Site Designator)
LINE 23 -- FIRE FOR EFFECT____________________________(Fire for Effect Number of
Volleys)
LINE 24 -- PROJECTILE_________________________________(Fire for Effect Projectile)
LINE 25 -- FUZE_______________________________________(Fire for Effect Fuze)
LINE 26 -- NARRATIVE_________________________________(Free Text for Additional Information Required for Clarification of Report)
LINE 27 -- AUTHENTICATION___________________________(Report Authentication)



