AVIATION (ARMY ROTARY WING) MISSION/SUPPORT REQUEST [AVIAREQ]
LINE 1 -- DATE AND TIME______________________________(DTG)
LINE 2 -- UNIT________________________________________(Unit Making Report)
LINE 3 -- ASSETS______________________________________(Assets Required)
EXAMPLE: Three (3) CH-47s
LINE 4 -- PURPOSE____________________________________(Purpose)
EXAMPLE: Emergency Logistical Resupply of Class IV at BP 53
LINE 5 -- PRIORITY____________________________________(Priority)
LINE 6 -- DTG and GRID of PZ____________________________(DTG and Location of Pickup Zone, include marking system, frequency and call sign of unit at the PZ)
LINE 7 -- DTG and GRID of LZ____________________________(DTG and Location of Loading Zone, include marking system, frequency and call sign of unit at the LZ)
LINE 8 -- A2C2________________________________________(A2C2 Route and Information (Ingress/Egress Route))
LINE 9 -- ENEMY ADA_________________________________(Probability of Enemy ADA)
LINE 10 -- TARGET_____________________________________(Target Location and Information for Planning)
LINE 11 -- LOAD_______________________________________(Estimated Load Requirements (Slings/Type of Ammunition))
LINE 12 -- POC________________________________________(POC of Requesting Unit for Coordination)
LINE 13 -- POC AT PZ/LD_______________________________(POC at Pickup Zone or LD)
LINE 14 -- POC AT LZ__________________________________(Unit Requesting POC at LZ)
LINE 15 -- FARP_______________________________________(Suggested FARP Locations Within Supported Area)
LINE 16 -- REMARKS___________________________________(Remarks with Safety Risk Assessment)
LINE 17 -- WEATHER___________________________________(Aviation Weather Forecast Within Supported Areas)
LINE 18 -- NARRATIVE_________________________________(Free Text for Additional Information Required for Clarification of Report)
LINE 19 -- AUTHENTICATION___________________________(Report Authentication)



