850-001-3001 (SL3) - Control Mission Safety Hazard

Standards: Verified that a risk assessment had been conducted, controls had been developed and properly implemented, the overall risk level for the mission or task was acceptable, and that the controls were effectively monitored.

Conditions: As a company level senior leader, in a garrison or tactical environment, given a subordinate who has received a mission or task.

Standards: Verified that a risk assessment had been conducted, controls had been developed and properly implemented, the overall risk level for the mission or task was acceptable, and that the controls were effectively monitored.

Performance Steps

1.   Verify a risk assessment has been conducted.

a. Ensure that all hazards associated with the mission or task have been identified.

b. Ensure the level of risk for each hazard was correctly estimated.

2.   Verify controls have been developed and properly implemented.

a. Ensure appropriate controls have been developed.

b. Ensure the residual risk for each hazard and the overall residual risk for the mission or task is acceptable.

c. Ensure controls have been properly implemented.

3.   Verify how the controls will be monitored.

a. Verify the technique for monitoring the controls.

b. Verify how well the controls and the risk management process worked.

Evaluation Preparation:

Setup: To evaluate this task, you will need a completed risk assessment for a mission task. It will be necessary to develop a short OPORD or FRAGO with a scenario for a commonly used combat operation (such as a road march, move to contact) that contains a minimum of one hazard. Develop a complete written risk assessment to represent an assessment, which a subordinate has performed. The risk assessment must include the level of risk, the controls, the residual risk for each hazard, and the overall residual risk for the mission.

Brief Soldier: Tell the soldier you are going to evaluate him on his ability to supervise the implementation of the risk management process.

Performance Measures

GO

NO GO

1.   Verified that all the hazards associated with the mission or task (a minimum of one, depending on the mission or task) had been identified.

--

--

2.   Verified the level of risk for each hazard was correctly estimated.

--

--

3.   Verified the controls for each hazard.

--

--

4.   Verified the residual risk for each hazard and the overall residual risk for the mission or task was acceptable.

--

--

5.   Verified methods for implementing the controls.

--

--

6.   Verified controls were effective.

--

--

Evaluation Guidance: Score the soldier GO if all performance measures are passed. Score the soldier NO GO if any performance measure is failed. If the soldier fails any performance measure, show what was done wrong and how to do it correctly.

References

 

Required

Related

 

FM 100-14

 

 

FM 101-5